Riga
Wall & Ceiling Preparation to Q3 Finish
The room was fully prepared for final decoration, with walls and ceilings brought up to a Q3 finish standard.
The work included filling and levelling uneven areas, repairing surface defects, repeated fine filling where required, and full sanding to achieve a smooth and consistent surface suitable for painting or wallpapering.
Decorative mouldings/coving were installed and finished into the surrounding surfaces, including joint preparation and filling for a clean continuous appearance.
The work also included preparation around electrical socket positions, ensuring the surrounding wall surfaces were level and ready for final fitting and decoration.
Window reveals were repaired, levelled and prepared, with new window sills fitted and finished into the surrounding wall surfaces.
The final stage involved detailed sanding and inspection of walls, ceilings, corners, mouldings and window areas to leave the room clean, even and ready for the chosen decorative finish.
BEFORE 17 photos
AFTER 5 photos
Related service · Full-Surface Finishing
Have a similar wall, ceiling or internal alteration?
See how WhiteLine approaches the construction, then send your own condition for review.